The short answer
Automating a sound existing gate usually takes one to three days on site once groundwork and cabling are ready. New gates, longer driveways, underground motors or sliding gates that need a concrete base take longer. Every automated gate must have safety devices fitted and be force tested before it is handed over.
1. Survey
We check the gates, posts and hinges, the slope of the drive, which way the gates should open, where power can come from and how you want to open them: remotes, keypad, intercom, app or number plate recognition.
2. Choosing the motor
- Ram or articulated arm motors mount on the posts and suit most swing gates.
- Underground motors are hidden below the gate for a cleaner look, but need groundwork and drainage.
- Sliding motors run along a track and suit sloping drives or limited space behind the gates.
3. Groundwork and cabling
Cable ducts are run under the drive between the posts, to the power supply and to any intercom or keypad post. This is often the most disruptive part, and timing depends on the surface: block paving, tarmac or gravel.
4. Installation and setup
We fit the motors, control panel, photocells and any safety edges, set open and close limits, speeds and soft stops, and add your remotes, keypad or intercom.
5. Safety testing and handover
An automated gate is a machine, so it must be safe. We fit photocells and, where needed, safety edges, then force test the gate to check it stops and reverses if it meets an obstruction. You get a demonstration, instructions on manual release and your documentation.
After installation
Gates need regular servicing so safety devices keep working and motors stay smooth. We can add your gate to a maintenance contract, with different levels of cover available. Read why maintenance matters.
This guide is general information from our experience as installers. Related service: Electric gate installation.